Documents

35 documents

Amendments for Council Consideration on March 12, 2020

Includes six different potential amendment packages including technical changes, a deeper affordability bonus, and historic resources protections.

Summary of Amendments to be Further Developed (February 13, 2020)

Summarizes the amendment proposals that received general support from City Council for further development

Summary of Potential Amendments (February 10, 2020)

Describes the amendment proposals for City Council’s worksession discussion on February 12, 2020

City Council Hearing Presentation

Overview of the Residential Infill Project proposals, presented on January 15, 2020.

City Council Recommended Draft Briefing presentation (December 11, 2019)

Recommended Draft (August 2019) - East District Coalition – Large format map

Provides tax lot level detail of R2.5, R5 and R7 zones showing maintained streets, recommended new ‘z’ overlay and R2.5 rezones.

Recommended Draft (August 2019) - North District Coalition – Large format map

Provides tax lot level detail of R2.5, R5 and R7 zones showing maintained streets, recommended new ‘z’ overlay and R2.5 rezones.

Recommended Draft (August 2019) - Southeast District Coalition – Large format map

Provides tax lot level detail of R2.5, R5 and R7 zones showing maintained streets, recommended new ‘z’ overlay and R2.5 rezones.

Recommended Draft (August 2019) - West District Coalition – Large format map

Provides tax lot level detail of R2.5, R5 and R7 zones showing maintained streets, recommended new ‘z’ overlay and R2.5 rezones.

Recommended Draft (August 2019) - Northeast District Coalition – Large format map

Provides tax lot level detail of R2.5, R5 and R7 zones showing maintained streets, recommended new ‘z’ overlay and R2.5 rezones.

Recommended Draft (August 2019) - Volume 3: Appendix G: Portland’s Historically Narrow Lots

Description of the origin of historically narrow lots and a summary of the applicable regulations over time.

Recommended Draft (August 2019) - Volume 3: Appendix F: R2.5 Zone Changes by District

Maps and rationale for selecting areas with concentrations of historically narrow lots to rezone from R5 to R2.5 reflects PSC’s possible amendments.

Recommended Draft (August 2019) - Volume 3: Appendix E: Catalog of 2015 New Single-Family House Permits in the R2.5 Zone

City staff analyzed the 2015 building permits for new one- and two-unit residential construction in the R2.5 zones.

Recommended Draft (August 2019) - Volume 3: Appendix D: "Visitability" Best Practices

Notes from visitability focus groups and cities that have implemented visitability regulations.

Recommended Draft (August 2019) - Volume 3: Appendix C: Use of Floor Area Ratios (FARs) in Single Family Zoning

Description of FAR and analysis of how different cities use FAR in single-dwelling zoning regulations.

Recommended Draft (August 2019) - Volume 3: Appendix B: Displacement Risk and Mitigation

BPS analysis of the displacement impacts of PSC’s possible amendments on affected vulnerable communities and potential mitigation strategies.

Recommended Draft (August 2019) - Volume 3: Appendix A: Revised Economic Analysis on the Proposed Changes to the Single-Dwelling Zone Development Standards

Memorandum from Johnson Economics LLC describes economic analysis methodology and findings for the Recommended Draft

Recommended Draft (August 2019) - Volume 2: Zoning Code Amendments

PSC’s recommended changes to the zoning code with accompanying commentary

Recommended Draft (August 2019) - Volume 1: Staff Report and Map Amendments

Introduction; summary and analysis of proposals; and map changes to reflect the PSC’s recommendations.

Recommended Draft (August 2019) - Summary

Eight-page summary of zoning code and map amendments, includes map of proposed ‘z’ overlay zone and historically narrow lot rezoning.

2018 January Comments on Discussion Draft

2019 February RIP Revised Proposed Draft

Middle Housing in Portland

Residential Infill Project Public Involvement Plan

Residential Infill Project Displacement Risk Analysis FAQ